CAME BPT have supplied the door entry and access control systems at London’s newest luxury development – Chelsea Waterfront. The XiP system was specified for this landmark project due to its unique flexibility and reliability, coupled with our industry known integration partnership with Crestron home automation. The ground floor entrances to the stunning blocks contain flush mounted Digitha video entry panels, with our own in-house metalwork team having manufactured bespoke faceplates, powder coated to the Architects’ exacting requirements to ensure consistency with the architectural design of the buildings.
- 12 Digitha Video Entry Panels
- 8 Bespoke Video Entry Panels
- 1 PC Based Virtual Concierge
- 179 Crestron Integrations
- 20 Proximity Readers
- 2 RF Receivers
Master planned by world renowned architect Sir Terry Farrell, Chelsea Waterfront will include two glass residential towers of 37 and 25 storeys, three riverside buildings arranged around landscaped gardens and the redevelopment of the historic Lots Road Power Station. The development will also include shops, restaurants and bars together with a residents' health and fitness club.
Find out more: http://www.chelseawaterfront.com